SIMBG 7 min read Updated 2026-07-06

How to Track PBG/SLF Applications on the Official SIMBG

Use the Track Application feature on simbg.pu.go.id to read your PBG/SLF status. This is a guide to reading the status without guessing.

How to Track PBG/SLF Applications on the Official SIMBG

SIMBG is an official system, not a consultant website

To track a PBG or SLF application, use the official government website at https://simbg.pu.go.id/#lacak-permohonan. A consultant website may help explain the process flow and prepare documents, but the official status remains in SIMBG.

PP 16/2021 Pasal 326 establishes SIMBG as a web-based electronic system for building construction processes. Therefore, if you receive status information from any party, it is best to cross-check it with the status on SIMBG.

What needs to be prepared for tracking

Generally, you need the registration number or application data provided during submission. If the application is handled by a consultant, ask for clear status information: what stage it is in, what documents are requested, and who needs to respond.

Do not just be satisfied with the answer “in progress”. The SIMBG status must be translatable into action. Is it waiting for administrative verification, waiting for technical document revisions, waiting for retribution payment, or waiting for document issuance?

How to read status without panicking

A status that seems slow does not always mean there is a problem with the application. Sometimes, the process is waiting for the inspection schedule, department response, or document correction. However, a status that has not moved for a long time needs to be analyzed: are there documents that have not been uploaded, technical notes that have not been answered, or owner data that do not match?

JKK helps owners not only by “tracking”, but by translating the status into a to-do list. This is important because many owners are not familiar with SIMBG terms, whereas each status usually has administrative or technical consequences.

Do not share sensitive data carelessly

When seeking third-party assistance, avoid sharing identification numbers, land documents, or account access without clear necessity. A good consultant only requests relevant data and explains why that data is needed.

For the JKK public website, example SIMBG statuses will not display owner names, full registration numbers, or detailed addresses. The same principle applies when helping clients: proof may be read, but privacy must be maintained.

Practical notes for building owners

Tracking SIMBG Applications is useful for reading the process stage, but the results need to be interpreted alongside the uploaded documents. The status in the system does not always explain all the causes of delays. Sometimes the problem is incomplete technical documents, drawings that do not reflect existing conditions, or inspection notes that need to be answered by technical personnel. Therefore, a status screenshot alone is not enough to conclude whether the process is easy or difficult.

Use the official link https://simbg.pu.go.id/#lacak-permohonan to view the initial status, then note the application number, service type, and the last visible stage. When consulting, simply send the status information and a summary of the problem; sensitive numbers can be blurred until the inspection needs are clear. If the status indicates a document repair is needed, the next step is to read the system notes and match them with field conditions, rather than just re-uploading the same file.

For existing building owners, tracking SIMBG also helps distinguish administrative barriers from technical barriers. Administrative barriers are usually related to applicant data or basic completeness. Technical barriers are related to drawings, reports, or building standards. This distinction is important so that owners do not waste time fixing the wrong part.

If the application was previously handled by another party, request a summary of the latest status before restarting. This information helps avoid duplicate accounts, double submissions, or conflicting document uploads. For JKK, the SIMBG status is the starting point for evaluating a case, not a place to guess results.

Secure consultation

Check the building's position before making a decision

Start with the document status you know: location, building function, PBG/IMB/SLF if any, and current usage conditions. Sensitive data only needs to be discussed after the document requirements are clear.

Ask via WhatsApp

Other articles

Continue reading

View all articles

SIMBG

TPA Session in SIMBG: Consultation Time Limit

Commercial buildings are reviewed by the Expert Professional Team (TPA). The PBG consultation phase is limited to a maximum of 28 working days and five reviews under PP 16/2021.

Consult