Mandala the Oasis villa with a long swimming pool bordering rice fields in Tibubeneng, Badung Regency — a Jiwa Karya Konsultan SLF project

PBG & SLF Consultant for Existing Buildings — Badung Regency

Building already stands, no PBG–SLF yet? Start with a technical assessment.

JKK helps villa, restaurant, shop-house, and residential owners in Badung assess the feasibility of existing buildings and process the issuance of PBG and SLF — clear stages, clear fees.

5.0 · 30+ Google reviews
194

Enforcement Actions · 2025

194 enforcement actions against non-compliant buildings by Satpol PP Badung throughout 2025.

1 Aug

2026 Deadline

As of August 1, 2026, accommodations without complete permits face delisting from OTAs.

5 yr

SLF Validity Period

Non-residential SLF valid for 5 years, residential for 20 years (PP 16/2021 Article 297).

Architecture does not stop at the drawing.” Ar. I Made Teguh Budiana, IAI — Founder

02 — Process

Five stages, from consultation to issued documents.

SIMBG Workflow
Pemkab Badung

01

Initial consultation

Check building status, function, location, existing permits, and preliminary risks via WhatsApp.

02

Survey & measurement

Team visits the site to document as-built conditions and prepare as-built drawing requirements.

03

Four-pillar technical assessment

Safety, health, comfort, and convenience evaluated by certified personnel.

04

SIMBG input & processing

Technical documents uploaded to SIMBG, including assistance during TPT/TPA hearings if needed.

05

SLF/PBG issued

Official Pemkab documents delivered once processing and all statutory obligations are fulfilled.

03 — Why JKK

We start with an audit, not a pitch.

Verified credentials
— no sensitive numbers

JKK surveyor alongside SIMBG Badung officers inspecting building conditions on the deck and garden area of an existing villa during a function compliance inspection
Pengkaji Teknis — surveyor walks the edge of a pool & villa deck during inspection / site: Badung

Before discussing fees or timelines, we audit your building's condition, measure on-site, then map the actual permitting pathway — even if the answer is that your building cannot yet be processed. Recommendations come after evidence, not before.

“Architecture does not stop at the drawing.”

— Ar. I Made Teguh Budiana, IAI · Founder JKK

  • Bali Province Architect License — DPMPTSP Bali (authority for PBG practice & building permits across Bali)
  • SBU LPJK AR001 Architectural Services active through January 2029
  • SBU LPJK RK001 Construction Engineering Services active through January 2029
  • Founder holds STRA Arsitek Madya and is an IAI member
  • SKK Ahli Penilai Kelaikan Bangunan Gedung — Architecture & Exterior Spatial Design (Level 9 Expert, BNSP)
  • SKK Ahli Penilai Bangunan Hijau (Level 9 Expert, BNSP)
  • Technical team holds BNSP SKK: Structure/Building Level 9 & Mechanical (MEP) Level 8
  • PERKINDO Full Member
  • Founder is a PAPTI Bali Province member
  • NIB OSS-RBA, AHU, and business entity NPWP

Founder & Principal

Led by a licensed architect — not a permit broker.

Photo of Ar. Ir. I Made Teguh Budiana, S.T., IAI — Founder of Jiwa Karya Konsultan

“Architecture does not stop at the drawing.”

— Ar. Ir. I Made Teguh Budiana, S.T., IAI

Ar. Ir. I Made Teguh Budiana, S.T., IAI leads Jiwa Karya Konsultan as a licensed architect — registered with STRA (Indonesian Institute of Architects) and holding a Bali Province Architect License from DPMPTSP. He is also competency-certified as an Ahli Penilai Kelaikan Bangunan Gedung and Ahli Penilai Bangunan Hijau (BNSP, level 9) — two competencies directly related to the role of Pengkaji Teknis in the SLF process.

Since 2021, he and his team have handled building permit assistance in Badung; CV Jiwa Karya Konsultan has been a legally-registered entity since August 2022. His working principle is simple: a building is truly finished when it is both fit for occupancy and legally compliant — not merely when construction ends.

  • STRA Arsitek Madya · IAI
  • Bali Province Architect License · DPMPTSP
  • SKK Ahli Penilai Kelaikan BG · Level 9
  • SKK Ahli Penilai Bangunan Hijau · Level 9
Full founder profile

Our team in the field.

Real JKK team photos
— not stock

Real documentation of functional-suitability inspections, technical testing, and surveys of existing buildings in Kabupaten Badung.

Click a photo to enlarge

05 — Track Record

0+

SLF/PBG documents in internal archive

0

Curated public Badung case studies

±9,251 m²

Curated SLF area (2022–2026)

0

Badung subdistricts: Kuta Utara · Mengwi · Kuta · Kuta Selatan

Google Reviews

What our clients say.

5.0 · 30+ Google reviews View Reviews on Google →
★★★★★
“Ngurus ijin di perusahaan ini bisa sangat mudah dan aman, urusan harga udah saya banding-bandingkan sama perusahaan lain, tapi yang paling masuk akal harganya perusahaan ini.”
Rahwanda Dzulmi Dwi Sandya via Google
★★★★★
“Made Teguh is one of the rare consultants that actually live in Canggu. Any advice he gives is not theoretical but learned from their own experiences on top of their official qualifications.”
Krishna Chieppa via Google
★★★★★
“I've trusted Pak Teguh and his team at Jiwa Karya Konsultan on several projects before, from villa permits to office permits in Seminyak and Canggu. Very reliable and honest.”
Herbert Irawan via Google
★★★★★
“Jasa konsultasi PBG dan SLF dengan kualitas service bagus dan tepat sasaran. Recommended service.”
Edo Widayana via Google
★★★★★
“Everything went perfectly! They were honest and upfront every step of the way with a very detailed timeline that came through exactly as they laid out.”
Bayu S.B via Google

Reviews sourced from Google Business Profile — displayed as-is.

06 — Fee Estimate

Estimated service fees per square meter.

SLF itself carries no
retribution fee — PP 16/2021 Art. 276(3) & 302(3)

Category 01

from Rp 200.000/m²

Residential

Estimated fee for simple or non-simple residential homes.

Category 02

from Rp 250.000/m²

Simple commercial

Business villas, shop-houses, restaurants, small clinics, and similar commercial functions.

Category 03

from Rp 300.000/m²

Complex commercial

Hotels, multi-unit complexes, sports facilities, healthcare facilities, or complex technical buildings.

Figures are service fee estimates; final pricing depends on complexity, document completeness, and technical building condition. For official PBG retribution simulation, use the government SIMBG calculator.

08 — Educational Videos

PBG & SLF regulations, summarized on video.

NotebookLM render
— educational summary, not legal advice

Video thumbnail: Era Baru Izin Bangunan Bali

Era Baru Izin Bangunan Bali

Educational summary of PBG & SLF regulations in Bali — from IMB to PBG, SLF obligations, and penalties for unpermitted buildings. ±6 minutes.

09 — FAQ

Frequently asked questions.

01 My building already stands without complete permits — can I still process an SLF? +

Yes. Existing buildings can still obtain an SLF retroactively (PP 16/2021 Article 282 paragraph (3)). If there is no PBG/IMB yet, both PBG and SLF can be submitted simultaneously via SIMBG. As-built drawings, technical assessment, and submission to the agency are required. This is our core service.

02 How long is an SLF valid? When should it be renewed? +

Per PP 16/2021 Article 297: 20 years for residential houses, 5 years for other building types (including commercial villas, restaurants, hotels). Start the renewal process before the validity period expires — the law does not set a specific day limit, but periodic inspection and the SIMBG process take time. We assist with reassessment and SIMBG.

03 Do I need to demolish my building to legalize it? +

The regulation does not make dismantling the starting point. Buildings declared not yet fit for function are directed toward recommendations (PP 16/2021 Pasal 299 ayat (2)): repairs and/or a PBG update — according to the inspection findings. As long as there is no serious violation (e.g. setback requirements) and the structure remains safe or can be strengthened, the route taken is functional suitability, not dismantling. If there are structural deficiencies, we recommend the most efficient strengthening measures.

04 Does JKK handle PBG for new buildings? +

Our focus is SLF and PBG for existing buildings in Badung Regency — not PBG for new builds that have not yet started construction. If your building falls into this category, mention it during your WhatsApp consultation; we will clarify whether it still qualifies under the existing-building pathway or needs alternative guidance.

05 Can I check my application status on SIMBG? +

Yes, application status can be tracked via the official Lacak Permohonan menu at simbg.pu.go.id. JKK also assists in interpreting status updates and identifying next document requirements.

See all questions & answers on the contact page

Start with a Conversation

Check your building's permit status, today.

Initial consultation via WhatsApp is free. Tell us about your building's condition — we'll help map the steps toward a fit and legal SLF. No email, no lengthy forms.

WhatsApp

0813-5387-3296

Chat JKK on WhatsApp

First consultation is free

Consult