JKK surveyor inspecting a building with measuring instruments during a technical function compliance assessment in Badung

Technical Service · Led by IAI Architect

Building fitness technical assessment & audit in Badung.

To issue an SLF, the government does not just ask for documents — they need technical proof that your building is truly safe and fit for use. This is where our architect's expertise comes in.

Every assessment we conduct is performed by professional experts and signed directly by Ar. Ir. I Made Teguh Budiana, IAI — a licensed architect who meets the requirements of Bali Governor Regulation No. 34/2023 on Architect Licensing.

5.0 · 30+ Google reviews See all reviews on Google Maps →
★★★★★
“Made Teguh is one of the rare consultants that actually live in Canggu. Any advice he gives is not theoretical but learned from their own experiences on top of their official qualifications.”
Krishna Chieppa via Google

01 — Definition

What is a Technical Assessment Report?

A Technical Assessment Report is an official document required for SLF submission via SIMBG (Building Management Information System). This document proves that your building meets functional fitness standards across architectural, structural, MEP, and safety aspects.

In accordance with applicable regulations, this report must be prepared and signed by a licensed professional expert — not just any consultant. JKK meets this requirement: all our technical work falls under the responsibility of an IAI-licensed architect with a valid STRA.

Bali Governor Regulation No. 34/2023 on Architect Licensing requires licensed architects to handle technical drawings for building permits in Bali. JKK fully complies with this requirement — every drawing and report we produce is legally valid.

02 — Audit Scope

Four disciplines we audit.

A comprehensive assessment covering all aspects examined by the authority during the SIMBG review session.

01

Architectural Audit

Inspection of layout conformity, dimensions, openings, accessibility (disabled access), and building setbacks against permitting documents and applicable regulations.

02

Structural Audit

Visual and technical inspection of foundations, columns, beams, slabs, and structural walls. For buildings with structural concerns, NDT (Non-Destructive Testing) may be added.

03

MEP Audit (Mechanical-Electrical-Plumbing)

Inspection of electrical systems, clean water & wastewater installations, HVAC systems, gas lines, and other utility systems in accordance with building safety standards.

04

Fire Protection Audit

Inspection of evacuation routes, fire extinguishers, sprinklers, hydrants, smoke/heat detectors, and fire alarm systems in accordance with mandatory SLF standards.

03 — Deliverables

Deliverables you receive.

All technical documents in one package — ready for SLF submission via SIMBG.

  1. 01

    As-Built Drawing

    Architectural, structural, and MEP drawings reflecting the building's current condition — not old plan drawings. Signed by a licensed architect. For buildings without existing drawings, we create them from field measurements.

  2. 02

    Functional Fitness Technical Assessment Report

    A comprehensive report covering 4-discipline audit results, remediation recommendations (if any), and the fitness statement required by SIMBG to issue the SLF.

  3. 03

    SLF Supporting Documents

    Fitness checklist, relevant technical calculations (load, electrical, fire protection), and the required SIMBG formats for the authority.

Common Case

Don't have working drawings or an old IMB?

Many existing buildings in Badung — especially villas built before 2021 — lack complete working drawings or a traceable IMB.

JKK handles this situation every day. We conduct comprehensive field measurements, then prepare as-built drawings from scratch — signed by a licensed architect in accordance with SIMBG requirements. This process is an integral part of our technical assessment package.

Measuring instruments used by JKK surveyors during field measurements to prepare as-built drawings of existing buildings
Field measurement — as-built from scratch / site: Badung

It Starts With a Conversation

Technical assessment consultation — free upfront.

Tell us about your building — type, size, and available documents. We'll provide a process overview and timeline estimate before any cost commitment.

WhatsApp

0813-5387-3296

Consult via WhatsApp

No hidden costs · consultant fees stated upfront

Consult